Start with the outcome and the deliverables
Two quotes can describe the same project in very different ways. Before comparing totals, agree on the audience, the message and where the finished video will appear. Then list the deliverables each supplier has actually included: number of videos, approximate durations, aspect ratios, languages, captions and whether social cutdowns are distinct edits or simple crops.
Ask for a written scope rather than inferring that a line labelled ‘one video’ includes every format your campaign needs. A landscape master and a vertical version may require different framing and text placement. The Dubai video production cost guide provides broader planning context, but a project quote should specify its own assumptions rather than rely on a general benchmark.
Compare the work and inputs behind each quote
Identify which stages are included: discovery, script, storyboard, filming, animation or generation, editing, sound, captions and final export. Production methods and filming availability are project-dependent; confirm them in the quote rather than assuming a crew, studio or particular technique is included. Ask who supplies the product imagery, brand assets, copy, translations and factual approvals.
For animation, ask whether the supplier will create models or work from existing assets, and whether those files are suitable for the intended shots. An existing product photo does not automatically provide a usable view of every side. If a quote depends on client-supplied materials, request an asset checklist and a process for flagging missing or unsuitable files before work begins.
Make revisions and approvals measurable
Look beyond the number of revision rounds. Ask what a round means, which stakeholders consolidate feedback, and which changes belong at script, storyboard, rough-cut or final stages. A late change to the core message may require rebuilding scenes, not just adjusting text. Have the supplier explain how out-of-scope requests are estimated and approved before extra work starts.
Agree on who can approve product accuracy and any regulated or sensitive claims. Include client response times and dependencies in the schedule, then ask how a delay or missing asset affects delivery. A clear approval path protects both parties: it gives the production team a reliable decision and prevents a final review from reopening every earlier choice.
Read usage rights and exclusions separately
Clarify what you receive and what you may do with it. Final exports, editable project files, raw footage, animation models and licensed third-party assets may have different handover terms. For music, talent, stock imagery and AI-assisted tools, ask which uses are covered: organic and paid channels, territory, duration, edits and any renewal conditions. Do not assume an exclusive or perpetual licence from a generic ‘rights included’ line.
Request an exclusions list covering items such as paid media, travel, permits where relevant, voice talent, translations, extra versions or future licence fees. An exclusion is not necessarily a problem; an undisclosed assumption is. If the business needs rights beyond the initial campaign, make that requirement part of the brief before the quote is finalised.
A hypothetical side-by-side comparison
Imagine a company requests a product launch video. Quote A offers one landscape master using client-supplied photographs and two rounds of consolidated feedback. Quote B includes a landscape master, a separately composed vertical edit and captions, but licenses music only for a defined campaign period. Neither is automatically better: the vertical edit may matter, while the music restriction may affect later use.
Send both suppliers the same clarification list: deliverables; source assets and production method; script and fact checking; revision definitions; schedule dependencies; usage rights; editable files; and exclusions. Ask each to revise its scope on the same assumptions. Only then compare totals and payment terms. For a project-specific conversation, see pricing information or contact the team.
Use a practical quote checklist
- Outputs: list duration, format, language, captions and delivery specifications for each version.
- Inputs: identify who supplies approved assets, product facts, access and translations.
- Workflow: confirm milestones, feedback rounds, approvers and the treatment of scope changes.
- Rights: record permitted channels, paid use, territories, term, third-party restrictions and handover files.
- Commercials: compare the total, payment milestones, assumptions and exclusions on the same brief.
Keep the final written scope with the signed agreement. When a supplier cannot commit to a detail yet, record it as an open decision and agree when it will be resolved.
Frequently asked questions
Should I choose the cheapest video quote?
Not on headline price alone. First check whether both proposals include equivalent deliverables, review and rights. A smaller scope may be appropriate if it still meets the actual brief.
Are project files always included?
No. Editable files, raw material and licensed components can be separate from final exports. Ask what is handed over and whether you have permission and software access to edit it.
What if the scope changes?
Ask for a written change request stating its effect on deliverables, cost, rights and schedule. Approve it before the additional work begins.
